The homeowner, job site, access notes, and waterproofing context field crews need before they arrive.
Calder Design Studio
Active
Phone
+1 646 555 0142
Email
studio@calderdesign.example
Type
Trade
Customer Notes
Trade account sourcing linens for a townhouse installation.
West Village Townhouse
New York County
Proposal And Scope
Accepted proposal details, copied scope, and sales context that should drive production decisions.
Q-DEMO-CALDER-001LEAD-2026-0002
Calder townhouse waterproofing quote
Install an interior drainage system along the rear and side walls, add a primary sump package, correct discharge routing, add vapor barrier at affected wall sections, and seal one active crack.
Job costing compares what the customer agreed to pay with what the job actually costs in labor, materials, and expenses. It helps owners see profit and catch jobs that are running over.
Simple operational costing from the proposal total, generated change-order invoice lines, invoices, payments, material usage, labor, and job expenses.
Notes, photos, status movement, schedule updates, and payment events in one scan-friendly history.
Schedule block created
Schedule
Jul 10, 2026, 8:38 AM
Work | Confirmed
Jul 9, 2026, 1:30 PM to Jul 10, 2026, 8:00 PM
Crew: Crew A
West Village Townhouse
Confirmed two-day production schedule linked to the CRM calendar job event.
Invoice Draft
Payment
Photo Progress
Track the required job photo story. Completion requires at least one After photo.
Before Photos
1
During Photos
1
After Photos
1
Completion Requirement
Met
Photos And Files
Upload before, during, and after photos, plus invoices, warranty files, job packets, and field documents. At least one After photo is required before completion.
Change Orders
Keep scope changes, customer approval notes, price impact, and signed supporting files together so the office has the full story.
Labor Tracking
Track daily labor with worker, labor type, hours, notes, and hourly cost rate snapshot. Admin/accounting edits update cost totals without changing historical rates elsewhere.
Office setup checklist before production scheduling and crew handoff.
Required
Deposit received?
Confirm the required deposit is collected or intentionally waived.
Open
Customer signed?
Confirm the homeowner accepted/signed the proposal version tied to this job.
Open
Financing status?
Record whether financing is approved, pending, declined, or not needed.
Done
Jul 8, 2026, 8:00 PM
Materials needed?
List special materials, long-lead items, or standard materials to pull.
Done
Jul 8, 2026, 8:05 PM
Permits needed?
Confirm whether permits are needed and who owns them.
Done
Jul 8, 2026, 8:10 PM
Access confirmed?
Confirm customer access, lockbox, parking, pets, and basement entry.
Done
Jul 8, 2026, 8:15 PM
Crew assigned?
Assign a crew or crew lead before moving the job to ready.
Done
Jul 8, 2026, 8:20 PM
Target schedule window?
Set a target production window before final scheduling.
Done
Jul 8, 2026, 8:25 PM
Day 1 Site Prep
Start-of-job checks for a finished townhouse basement.
Required
Confirm access
Call customer before arrival and confirm basement access.
Open
Protect finished surfaces
Protect entry path, stairs, and finished floor surfaces.
Open
Capture before photos
Take before photos of all work areas and active water points.
Open
Pre-job office checklist
Office readiness checks before a crew is sent to the job site.
Required
Signed proposal is in the job file
Open
Deposit/payment requirement is confirmed
Open
Crew assignment and schedule are confirmed
Open
Materials, permits, and special equipment are reviewed
Open
Customer access notes are confirmed
Open
Basement prep checklist
Prep steps before waterproofing work starts inside a basement.
Required
Confirm work area is clear or document obstructions
Open
Protect finished surfaces and customer belongings
Open
Identify utilities, panels, drains, and shutoffs
Open
Set dust control and debris path
Open
Take before photos
Open
Interior drainage checklist
Interior drain installation checks for basement waterproofing jobs.
Required
Confirm drain layout and linear feet
Open
Sawcut and remove concrete safely
Open
Install drainage channel and stone
Open
Tie drain into sump or discharge path
Open
Replace concrete and clean work area
Open
Sump pump checklist
Sump pump installation, replacement, and startup checks.
Required
Confirm sump location and basin condition
Open
Install pump, check valve, and discharge piping
Open
Confirm power source and backup requirements
Open
Test pump operation with water
Open
Explain pump basics to customer if present
Open
Vapor barrier checklist
Moisture-control checks for vapor barrier installation.
Required
Confirm vapor barrier area and attachment method
Open
Prepare wall or crawlspace surface
Open
Install barrier with seams and terminations secured
Open
Seal penetrations as required
Open
Take after photos of completed barrier
Open
Foundation wall repair checklist
Foundation wall crack and reinforcement checks.
Required
Confirm repair locations and counts
Open
Prepare cracks or reinforcement surfaces
Open
Install repair system per selected method
Open
Document completed repair with photos
Open
Flag any movement or structural concern for office review
Open
Completion/cleanup checklist
End-of-job cleanup and quality checks before leaving the site.
Required
Remove debris and unused materials
Open
Sweep work and traffic areas
Open
Take after photos
Open
Confirm tools and equipment are loaded
Open
Report punch-list items to office
Open
Final customer walkthrough checklist
Customer-facing walkthrough before closeout.
Required
Walk customer through completed work when available
Open
Review pump/discharge basics if applicable
Open
Confirm customer questions or concerns
Open
Capture final customer note for office
Open
Confirm final photos are uploaded
Open
Status
Update the job status and keep a short history of important production changes.
Not Scheduled to Scheduled
Jul 8, 2026, 6:30 PM | Ari Leone
Scheduled
Crew A confirmed for Day 1 kickoff.
Created to Not Scheduled
Jul 8, 2026, 2:00 PM | Ari Leone
Not Scheduled
Operations job created from demo quote context.
Invoices And Payments
Create final invoices from the proposal/job total, optional change-order adjustment, and paid deposit credits. Email sends use the active environment provider and log retryable failures.
Deposit Status
Deposit Needed
Deposit Paid
$0.00
Deposit Balance
$5,655.90
Final Balance
Not created
Proposal Total
$18,853.00
Invoice Count
1
Job Completion
How do I complete a job?
Finish or waive required checklist items, upload after photos, write final notes, record the customer walkthrough, and note any balance or punch items before submitting.
Close out production, prepare final accounting and warranty records, and schedule the customer review follow-up.
Required Checklist
6/51 closed
Add waiver reasons below or finish these items before submitting.
After Photos
1 uploaded
Completion is blocked until at least one After photo is uploaded.
Final Invoice
Warranty Tracking
A warranty draft is created automatically when the job completion workflow is submitted.
No warranty draft yet
Complete this job first, then review warranty type, covered scope, exclusions, dates, and PDF status here.
Customer Conversation
Jul 9, 2026, 4:25 PM | Marina Rossi
Internal
Customer conversation: designer requested a phone call before sawcutting begins and daily cleanup before leaving.
Crew
Jul 9, 2026, 4:00 PM | Ari Leone
Crew
Vendor: Demo Hauling Co. | Disposal / Hauling
Crew note: bring extra floor protection, dust control plastic, and a backup check valve for the sump package. Demo Hauling Co. is standing by for debris pickup.
Weather
Jul 9, 2026, 3:10 PM | Ari Leone
Internal
Weather note: heavy rain expected overnight. Crew should verify discharge routing and keep materials staged inside.
Daily Progress
Jul 9, 2026, 2:35 PM | Ari Leone
Crew
Day 1 progress: access confirmed, floor protection placed, and drain route reviewed with the designer before concrete work.
Non-Billable
J-DEMO-CALDER-001
Jul 10, 2026, 8:38 AM
INV-DEMO-CALDER-001-DEP
$5,655.90 Deposit invoice
Due Jul 15, 2026, 4:00 PM
Deposit for Calder townhouse waterproofing installation
Customer conversation
Note
Jul 9, 2026, 4:25 PM
Customer Conversation | Internal | Marina Rossi
Customer conversation: designer requested a phone call before sawcutting begins and daily cleanup before leaving.
Crew note
Note
Jul 9, 2026, 4:00 PM
Crew | Crew | Ari Leone
Crew note: bring extra floor protection, dust control plastic, and a backup check valve for the sump package. Demo Hauling Co. is standing by for debris pickup.
Weather note
Note
Jul 9, 2026, 3:10 PM
Weather | Internal | Ari Leone
Weather note: heavy rain expected overnight. Crew should verify discharge routing and keep materials staged inside.
Before photo of rear basement wall and floor edge.
Daily progress note
Note
Jul 9, 2026, 2:35 PM
Daily Progress | Crew | Ari Leone
Day 1 progress: access confirmed, floor protection placed, and drain route reviewed with the designer before concrete work.
Status changed
Status
Jul 8, 2026, 6:30 PM
Not Scheduled to Scheduled | Ari Leone
Crew A confirmed for Day 1 kickoff.
Status changed
Status
Jul 8, 2026, 2:00 PM
Not Scheduled | Ari Leone
Operations job created from demo quote context.
Photos, PDFs, Word files, spreadsheets, CSV, or text files up to 20 MB.
After photoImage
After photo for demo completion requirement.
Calder after cleanout.jpg
Size
388 KB
Uploaded
Ari Leone | Jul 9, 2026
During workImage
During work photo showing drain layout and protected traffic path.
Calder during drain layout.jpg
Size
428 KB
Uploaded
Ari Leone | Jul 9, 2026
Before photoImage
Before photo of rear basement wall and floor edge.
Calder before basement wall.jpg
Size
402 KB
Uploaded
Ari Leone | Jul 9, 2026
Field Labor6.50 hrs | $273.00
Field LaborJul 9, 2026
Dante Marino | 6.5 hrs
$42.00 / hr | $273.00 total
Entered by Ari Leone | Operations
Last edited by Ari Leone | Operations
Demo labor entry for site protection, layout review, and material staging.
Admin / Accountant Edit
Material Usage
Track material usage for job costing. Each entry snapshots the selected price book item, quantity, unit cost, and used date. This does not decrement inventory yet.