Interior perimeter drain tile with trenching, stone, pipe, and wall flange.
Qty 86 | Unit $92.00 | Cost $42.00 | Margin 54.35%
$7,912.00
Command Center
Calendar
Quote Builder
Sent As ProposalCalder Design Studio | 42 Bank Street, New York, New York County, NY, 10014
Review customer-facing language, discount, deposit, and current quote status before handing the quote off to a proposal.
Qty 86 | Unit $92.00 | Cost $42.00 | Margin 54.35%
$7,912.00
Qty 1 | Unit $1,250.00 | Cost $475.00 | Margin 62.00%
$1,250.00
Qty 86 | Unit $68.00 | Cost $28.00 | Margin 58.82%
$5,848.00
Qty 42 | Unit $42.00 | Cost $18.00 | Margin 57.14%
$1,764.00
Qty 220 | Unit $4.95 | Cost $1.85 | Margin 62.63%
$1,089.00
Qty 1 | Unit $395.00 | Cost $145.00 | Margin 63.29%
$395.00
Qty 1 | Unit $595.00 | Cost $265.00 | Margin 55.46%
$595.00
Use this internal panel to move a quote from estimator draft to Owner/Admin approval before proposal handoff.
This is an on-screen preview only. Customer proposal PDFs are intentionally not part of this task.
Q-DEMO-CALDER-001
Calder Design Studio | West Village Townhouse
Install an interior drainage system along the rear and side walls, add a primary sump package, correct discharge routing, add vapor barrier at affected wall sections, and seal one active crack.
Interior perimeter drain tile with trenching, stone, pipe, and wall flange.
86 LF | Base
$7,912.00
Primary sump pump, basin lid, check valve, and standard installation.
1 EA | Base
$1,250.00
Concrete saw cut, removal, pour-back, and basic finish.
86 LF | Base
$5,848.00
Buried discharge or downspout line with pipe, fittings, and trench backfill.
42 LF | Base
$1,764.00
Wall or crawlspace vapor barrier material and standard fastening/sealing.
220 SQFT | Base
$1,089.00
Interior polyurethane crack injection with ports and surface seal.
1 EA | Base
$395.00
Dumpster, disposal, haul-off, and debris handling allowance.
1 ALLOW | Base
$595.00