Sferra Command Center
Job Packet
Calder townhouse waterproofing installation
Job
J-DEMO-CALDER-001
Scheduled
Job Address
42 Bank Street, New York, NY, 10014
Scheduled Dates
Jul 9, 2026, 1:30 PM to Jul 10, 2026, 8:00 PM
Crew
Crew A
Photos
3 attached
Customer / Property Contact
- Customer
- Calder Design Studio
- Phone
- +1 646 555 0142
- studio@calderdesign.example
- Job Address
- 42 Bank Street, New York, NY, 10014
- City / County
- New York / New York County
Schedule / Crew
- Scheduled Dates
- Jul 9, 2026, 1:30 PM to Jul 10, 2026, 8:00 PM
- Crew
- Crew A
- Job Status
- Scheduled
- Packet Generated
- Sep 18, 2026, 6:31 PM
Scope Of Work
Install an interior drainage system along the rear and side walls, add a primary sump package, correct discharge routing, add vapor barrier at affected wall sections, and seal one active crack.
Access Notes
Contractor has lockbox access during weekday work hours. Access confirmed Jul 8, 2026, 8:00 PM.
Safety Notes
Field-friendly demo job. Confirm access, protect finished floors, and document before/during/after photos. Confirm utilities, wet areas, dust controls, PPE, stairs, pets, parking, and electrical hazards before work starts.
Material Checklist
- Load and confirm: Interior drain pipe, washed stone, sump package, discharge line materials, vapor barrier, and crack repair kit.
- Permit note: No permits expected for interior waterproofing phase.
- Confirm tools, PPE, dust control, floor protection, and disposal/haul-off supplies.
- Confirm pump, discharge, drain, vapor barrier, concrete, crack repair, or structural materials that match the scope.
- Materials needed? (Done)
- Materials, permits, and special equipment are reviewed (Open)
- Sawcut and remove concrete safely (Open)
- Install drainage channel and stone (Open)
- Replace concrete and clean work area (Open)
- Install pump, check valve, and discharge piping (Open)
Crew Checklist
Day 1 Site Prep
Start-of-job checks for a finished townhouse basement.
- Confirm access - Open - RequiredCall customer before arrival and confirm basement access.
- Protect finished surfaces - Open - RequiredProtect entry path, stairs, and finished floor surfaces.
- Capture before photos - Open - RequiredTake before photos of all work areas and active water points.
Pre-job office checklist
Office readiness checks before a crew is sent to the job site.
- Signed proposal is in the job file - Open - Required
- Deposit/payment requirement is confirmed - Open - Required
Photos



Payment / Deposit Status
Office/Admin Only- Deposit Status
- Deposit Needed
- Deposit Amount
- $5,655.90
- Deposit Percent
- 30.00%
- Proposal Total
- $18,853.00
- Invoices
- INV-DEMO-CALDER-001-DEP: $5,655.90 total, $0.00 paid, $5,655.90 due (Draft)
Signature / Walkthrough Checklist
- Review completed work with customer when available.
- Point out sump/discharge basics if applicable.
- Confirm access areas are clean and tools are removed.
- Capture customer concerns, punch-list items, or final notes.
Walkthrough Sign-Off
- Crew lead confirms completed scope and site cleanup.
- Customer walkthrough completed or office notified if customer unavailable.
- Final photos and walkthrough notes captured before leaving.
Customer / Authorized Contact
Date
